PD plan template for VET trainers and assessors

By the TrainersCPD editorial team.

A one-page plan template for a trainer's year of development, built from their last review and the units they deliver. It covers both training practice and industry currency.

Why plan PD at all

PD that is planned is easier to justify, easier to fit around teaching and easier to show at audit. ASQA's practice guides for the Standards for RTOs 2025 expect an RTO to have a system for reviewing trainer performance and industry currency, and to use the results to plan development. Western Australia's Training Accreditation Council says much the same: RTOs should be able to show planned development, participation, and how it lines up with industry.

A one-page plan is enough. What matters is that it is yours, it is dated and you come back to it.

Start from your review and your units

Before you choose any activity, gather three things:

  1. The units you deliver this year. List them, with the industry each one belongs to.
  2. What has changed in those industries. New equipment, materials, software, regulations or work methods.
  3. Your last review or observation. Take two or three goals from what your manager or a peer suggested.

Those three lists will tell you most of what you need to learn.

The template

Copy this table into a document or spreadsheet. One row per goal.

Goal Type Activity When Units or skills How I will show it Done
Example: give clearer written feedback Training practice Short course on feedback, then peer review of three assessments Term 1 All units Certificate and peer notes
Example: catch up on new equipment Industry currency Two days of product training with a supplier Term 2 Units in the plumbing cluster Attendance record and notes

Keep the "How I will show it" column honest. If you cannot name the evidence, the activity may not be worth planning.

Balancing practice and currency

Most trainers need both kinds of goal:

  • Training practice (Outcome Standard 3.2): continuing PD, including in the skills to engage with and support students. Assessment, feedback, inclusion, digital delivery and reflective practice all belong here.
  • Industry currency (Outcome Standard 3.3): current industry skills and knowledge for the units you deliver.

A plan with only one kind is a warning sign. Aim for at least one goal of each.

How much to plan

Neither the 2015 nor the 2025 Standards set a number of PD hours. Many RTOs set an internal target, so check your RTO's PD policy. Plan by relevance first, then check your plan against any target, rather than the other way round. How many PD hours do VET trainers need? explains this in more detail.

Review the plan during the year

Bring the plan to each supervision or review meeting. Tick off what is done, move what slipped and add goals that came up. A plan that changes during the year is normal. A plan that never changes is usually a plan nobody looked at.

A filled-in example

Here is how a completed plan might look for a trainer delivering construction units:

Goal Why Activities Evidence When
Current knowledge of new formwork systems New products in use on local sites Two days on site with an employer partner; supplier product session Site supervisor letter, attendance record, notes Term 2
Better assessment of practical tasks Validation found unclear observation criteria Workshop on observation checklists; rewrite two checklists with a colleague Certificate, revised checklists, validation notes Term 3
Supporting students with literacy needs Several students struggling with written tasks Short course on language, literacy and numeracy support; meeting with LLN support staff Certificate, reflection Term 4

Each goal has a reason that comes from the trainer's own context, each activity has evidence, and each sits in a realistic part of the year.

Common mistakes in PD plans

  • Goals that are really activities. "Attend the annual conference" is an activity. The goal is what you want to be able to do or know because of it.
  • Only one kind of PD. A plan full of industry visits with nothing on training and assessment practice, or the reverse, leaves a gap your RTO will notice.
  • No link to the units you deliver. Currency needs to relate to what you actually teach and assess.
  • No evidence planned. If you decide in advance what evidence each activity will produce, you are far less likely to be left without it.
  • Writing the plan once and forgetting it. A plan that is never updated quickly stops matching what you do.

Turning the plan into a record

When an activity is done, move it from your plan into your CPD record with the date and evidence. Our CPD record template for trainers matches the columns above, and the CPD planner can hold both in one place.

On TrainersCPD a free account is enough to start. Each course states its CPD hours, which go into your record when you pass the short check, and you can add PD you did elsewhere.

Request a callback

Frequently asked questions

Do I need a written PD plan?

The Standards do not prescribe a form, but RTOs must show planned development. Your RTO may ask for one.

How many hours should my plan include?

The Standards set none. If your RTO has an internal target, plan to meet it with relevant PD.

What is the difference between a PD plan and a PD record?

A plan looks ahead at what you intend to do. A record shows what you did and what changed.

Should industry currency be in my PD plan?

Yes. Plan both training practice and industry currency activities.

Sources

More guides

Request a callback · Browse courses